Craney Island Earthwork IDIQ, Portsmouth, Virginia
Contact and place of performance
Dariya M. Walker
Portsmouth, VA 23703
USA
02/17/2021 - Posted Abstract of Offerors. 02/04/2021 - Posted Amendment 0002, updated wage determination. 01/13/2021 - Posted Amendment 0001, Site Visit information. 01/11/2021 - Uploaded solicitation, plans and specifications. The work consists of site improvements at Craney Island Dredged Material Management Area (CIDMMA). CIDMMA is a confined upland dredged material placement site located in Portsmouth, Virginia a...
View moreThe Department of the Army, through the Norfolk District (W2SD ENDIST NORFOLK), issued solicitation W9123621B5007 for earthwork at the Craney Island Dredged Material Management Area (CIDMMA) in Portsmouth, Virginia. This procurement is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Y1KF, Construction of Dredging Facilities. The project is designated as an SBA (Small Business Administration) set-aside.
The scope of work involves site improvements at the CIDMMA, a confined upland dredged material placement site situated adjacent to the Port of Hampton Roads. Primary activities include borrow area preparation to dewater saturated materials, the excavation and reclamation of dredged material, and the transportation of these materials for use in site infrastructure projects. Specific tasks include the construction and maintenance of containment and division dikes to compaction standards, the development of access roads, the creation of spillway foundation pads, and the installation of riprap for shoreline stabilization. Contractors are also responsible for excavating saturated materials around spillway components and performing miscellaneous steel work on spillbox structures.
The solicitation period closed on February 11, 2021, following several updates, including an abstract of offerors, a site visit roster, and amendments regarding wage determinations. Seven attachments accompanied the notice, providing the solicitation documents, revised plans, and technical specifications. Point of contact for this requirement is Dariya M. Walker.