Name | Type | Posted | Actions |
|---|---|---|---|
ABSTRACT OF OFFERORS 21B5007 CI Earthwork IDIQ 02172021.pdf | Feb 17, 2021 | ||
A.07.24_21B5007_Amendment 0002_02042021.pdf | Feb 4, 2021 | ||
Site Visit Roster_20210121.pdf | Jan 26, 2021 | ||
A.01.24_21B5007_Amendment 0001_01132021.pdf | Jan 13, 2021 | ||
A.07.23_Solicitation_21B5007_01112021.pdf | Jan 12, 2021 | ||
H.01.01_CI Earthwork_RTA_PLANS_revised.pdf | Jan 12, 2021 | ||
H.01.04_CI Earthwork_RTA_SPECIFICATIONS.pdf | Jan 12, 2021 |
Craney Island Earthwork IDIQ, Portsmouth, Virginia
Craney Island Earthwork IDIQ, Portsmouth, Virginia
Contact and place of performance
Dariya M. Walker
Portsmouth, VA 23703
USA
02/17/2021 - Posted Abstract of Offerors. 02/04/2021 - Posted Amendment 0002, updated wage determination. 01/13/2021 - Posted Amendment 0001, Site Visit information. 01/11/2021 - Uploaded solicitation, plans and specifications. The work consists of site improvements at Craney Island Dredged Material Management Area (CIDMMA). CIDMMA is a confined upland dredged material placement site located in Portsmouth, Virginia a...
View moreThe Department of the Army, Norfolk District, issued this solicitation for a firm-fixed-price, Indefinite Delivery Indefinite Quantity (IDIQ) contract to perform site improvements at the Craney Island Dredged Material Management Area (CIDMMA) in Portsmouth, Virginia. This procurement is a Small Business Administration (SBA) set-aside under NAICS code 237990, Other Heavy and Civil Engineering Construction, and PSC code Y1KF, Construction of Dredging Facilities. The work involves preparing borrow areas to dewater saturated materials, excavating and reclaiming dredged materials, and transporting those materials to construct site improvement infrastructure. Specific activities include the construction and maintenance of containment and division dikes, access roads, spillway foundation pads, and effluent discharge pipes.
Additional project requirements include the installation of riprap for shoreline stabilization, miscellaneous steel work at spillbox structures, and the placement of reclaimed material as overburden to facilitate the consolidation of saturated materials. Contractors are also responsible for excavating saturated dredged material from around spillways to maintain components and structures. The solicitation, identified as W9123621B5007, had a response deadline of February 11, 2021. Seven attachments were provided during the solicitation process, including an abstract of offerors, two amendments, a site visit roster, and revised plans and specifications. Dariya M. Walker is the designated point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.