Name | Type | Posted | Actions |
|---|---|---|---|
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 6, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 6, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9123626RA006¬iceType=Presolicitation | LINK | Mar 6, 2026 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 6, 2026 |
CONSTRUCTION OF DORMITORY AT JOINT BASE LANGLEY-EUSTIS, HAMPTON, VA
Contact and place of performance
Jacob Coody
Not specified
Construct a dormitory with all necessary spaces to house 144 enlisted personnel at Joint Base Langley-Eustis. The construction includes 12 accessible rooms, compacted fill above the 100-year flood plain, reinforced concrete foundations and floor slabs, structural steel frame at building core and load bearing metal studs at building wings. The exterior walls are brick facade, precast concrete base, and limited metal p...
View moreThe Department of the Army, through the W2SD ENDIST Norfolk office, is seeking the construction of a dormitory at Joint Base Langley-Eustis under solicitation number W9123626RA006. This project, classified under NAICS 236220 Commercial and Institutional Building Construction and PSC Y1FC CONSTRUCTION OF TROOP HOUSING FACILITIES, involves building a facility to house 144 enlisted personnel. The scope of work includes 12 accessible rooms, compacted fill above the 100-year flood plain, reinforced concrete foundations, and a structural steel frame. The exterior will feature a brick facade, precast concrete base, and a dual roofing system consisting of standing seam metal and a low-slope single-ply membrane.
The project requires comprehensive site preparation, including the remediation of petroleum-contaminated soil within the building footprint, site improvements, and the installation of necessary utilities and pavements. Construction must adhere to Department of Defense Unified Facilities Criteria 1-200-01 for permanent construction and UFC 4-010-01 for anti-terrorism and force protection standards. Additional technical requirements include long-run outside plant communications, manhole/duct system pathways, and ensuring the facility can withstand prescribed seismic and wind effects.
This requirement is subject to Project Labor Agreement requirements and includes one PDF attachment posted on March 6, 2026. Responses are due by March 21, 2026. Jacob Coody serves as the point of contact for this notice.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.