CONSTRUCTION OF DORMITORY AT JOINT BASE LANGLEY-EUSTIS, HAMPTON, VA
CONSTRUCTION OF DORMITORY AT JOINT BASE LANGLEY-EUSTIS, HAMPTON, VA
Contact and place of performance
Jacob Coody
Not specified
Construct a dormitory with all necessary spaces to house 144 enlisted personnel at Joint Base Langley-Eustis. The construction includes 12 accessible rooms, compacted fill above the 100-year flood plain, reinforced concrete foundations and floor slabs, structural steel frame at building core and load bearing metal studs at building wings. The exterior walls are brick facade, precast concrete base, and limited metal p...
View moreThe Department of the Army, specifically the W2SD ENDIST Norfolk office, has issued solicitation W9123626RA006 for the construction of a dormitory at Joint Base Langley-Eustis. This project involves the development of a facility designed to house 144 enlisted personnel, including 12 accessible rooms. Construction requirements include reinforced concrete foundations, a structural steel frame, load-bearing metal studs, and exterior finishes consisting of brick facade and precast concrete. The scope covers extensive site work such as compacted fill above the 100-year flood plain, remediation of petroleum-contaminated soil, long-run outside plant communications, and connections to existing utility infrastructure.
This requirement is classified under NAICS 236220, Commercial and Institutional Building Construction, and PSC Y1FC, Construction of Troop Housing Facilities. The facility must be designed as permanent construction following Department of Defense Unified Facilities Criteria and must meet specific seismic, wind, and anti-terrorism/force protection requirements. Supporting work includes site preparation, pavements, security enhancements, and area lighting to ensure a complete and usable facility.
This project is subject to Project Labor Agreement requirements. Responses are due by March 21, 2026, with Jacob Coody serving as the point of contact. One unnamed PDF attachment was provided with the initial notice on March 6, 2026, containing additional presolicitation details.