Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 8, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 8, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 8, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9126G26RA019¬iceType=SolicitationNotice | LINK | May 8, 2026 |
Climate Controlled Storage Facility
Contact and place of performance
Kristi MORRIS
Not specified
Updating to include the Site Visit Sign-In sheet and photos. // The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Climate Controlled Storage Facility, Red River Army Depot, Texas. For details, see attached Solicitation located in the PIEE Solicitation Module.
The Department of the Army, via the U.S. Army Corps of Engineers Fort Worth District, is soliciting bids for a Design-Bid-Build construction project to establish a climate-controlled storage facility at the Red River Army Depot in Texas. This procurement is a 100% Small Business Set-Aside (SBA). The work falls under NAICS code 236220, Commercial and Institutional Building Construction, and PSC Y1GZ, Construction of Other Warehouse Buildings.
The solicitation period includes an update containing site visit documentation and photographs. Responses to solicitation W9126G26RA019 are due by June 22, 2026. The project documentation includes one PDF attachment posted on May 8, 2026, and the primary point of contact is Kristi Morris. Full project details and specifications are managed through the PIEE Solicitation Module.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.