Name | Type | Posted | Actions |
|---|---|---|---|
SOW RML CAMPUS ELECTRICAL MAINTENANCE - ATTACHMENT C - EQUIPMENT SCHEDULES JUNE 2021.pdf | Jun 29, 2021 | ||
SF30 Amendment 01 to 75N99021R00025.pdf | Jun 29, 2021 | ||
SOW RML CAMPUS ELECTRICAL MAINTENANCE - PROJECT REQUIREMENTS JUNE 2021.pdf | Jun 29, 2021 | ||
SOW RML CAMPUS ELECTRICAL MAINTENANCE - ATTACHMENT A - TESTING REQUIREMENTS JUNE 2021.pdf | Jun 29, 2021 | ||
SOW RMLCAMPUS ELECTRICAL MAINTENANCE - ATTACHMENT B - NETA TABLES JUNE 2021.pdf | Jun 29, 2021 | ||
Solicitation 75N99021R00025 RML Campus Electrical Testing.pdf | Jun 25, 2021 | ||
SOW RML Electrical Testing.pdf | Jun 25, 2021 | ||
SOW NETA Tables and Appendix.pdf | Jun 25, 2021 | ||
SOW NETA Testing Requirements.pdf | Jun 25, 2021 | ||
SCA Wage Determination 2015-5402 Rev-11 dated 06-30-2020.pdf | Jun 25, 2021 |
Electrical Switch/Breaker Maintenance Services
Contact and place of performance
Jim Parr
Hamilton, MT 59840
USA
The Contractor shall provide all technical supervision, equipment, labor and materials necessary to perform the scope of work as described for a complete 5 Year Periodic Test, Inspection, and Maintenance of the Electrical Distribution Switchgear. Testing shall be in accordance with the latest editions of the National Fire Protection Association (NFPA); National Electrical Code (NFPA 70), Recommended Practice for Elec...
View moreThe National Institutes of Health, NIH A&E Construction, is soliciting services for a complete five-year periodic test, inspection, and maintenance of electrical distribution switchgear at the Rocky Mountain Laboratories (RML) campus in Hamilton, Montana. The contractor is responsible for providing all technical supervision, equipment, labor, and materials necessary to test existing electrical switchgear, switchboards, distribution panelboards, primary oil-filled transformers, primary switches, and underground primary cabling systems. The scope also includes performing required maintenance on existing switchgear to ensure compliance with the latest editions of the National Fire Protection Association (NFPA) and IEEE standards, including NFPA 70, 70B, 70E, 99, 101, and IEEE 242-2001.
This pre-solicitation, identified by solicitation number 75N99021R00025, is categorized under NAICS code 238210 for Electrical Contractors and Other Wiring Installation Contractors and PSC code H959 for Other Quality Control/Test/Inspection of Electrical and Electronic Equipment Components. The procurement is designated as an SBA (SBA) set-aside. Interested parties must submit responses by the deadline of July 28, 2021.
Administrative oversight for this requirement is managed by Jim Parr. Documentation associated with this opportunity includes ten attachments, such as the primary solicitation, project requirements, testing requirements, equipment schedules, and NETA tables. All work and performance will take place on-site in Hamilton, Montana.