Name | Type | Posted | Actions |
|---|---|---|---|
REV (1) ATTACHMENT JL9 Historical Small Business Utilization.docx | DOCX | Oct 21, 2020 | |
N6247020R5003 0005.pdf | Oct 21, 2020 | ||
REV (3) ATTACHMENT JL8 Proj Data Sheet.docx | DOCX | Oct 21, 2020 | |
N6247020R5003 0004.pdf | Oct 15, 2020 | ||
REV (2) ATTACHMENT JL8 Proj Data Sheet.docx | DOCX | Oct 15, 2020 | |
REV (1) ATTACHMENT JL8 Proj Data Sheet.docx | DOCX | Oct 8, 2020 | |
REV (1) ATTACHMENT JL4 Proposed Distribution of Work.docx | DOCX | Oct 8, 2020 | |
N6247020R5003 0003.pdf | Oct 8, 2020 | ||
REV (1) ATTACHMENT JL10 SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SBPCD).docx | DOCX | Oct 8, 2020 | |
REV (1) ATTACHMENT JL6 Proposed Historical and Year to Date Ind Rates.docx | DOCX | Oct 8, 2020 | |
N6247020R5003 0002.pdf | Sep 23, 2020 | ||
N6247020R5003 0001.pdf | Sep 3, 2020 | ||
ATTACHMENT JL9 Historical Small Business Utilization.docx | DOCX | Aug 20, 2020 | |
ATTACHMENT JL11 SBSP.docx | DOCX | Aug 20, 2020 | |
ATTACHMENT JL13 PPQ.docx | DOCX | Aug 20, 2020 | |
N6247020R5003 SF33.pdf | Aug 20, 2020 | ||
ATTACHMENT JL1 List of Directives.doc | DOC | Aug 20, 2020 | |
ATTACHMENT JL2 Direct Labor Rate Submission and JL2A Rate Build Up.xls | XLS | Aug 20, 2020 | |
ATTACHMENT JL3 Uncompensated Overtime.docx | DOCX | Aug 20, 2020 | |
ATTACHMENT JL12 AWARD FEE PLAN.doc | DOC | Aug 20, 2020 | |
ATTACHMENT JL5 Indirect Ceiling Rate and Award Fee Application Form.DOC | DOC | Aug 20, 2020 | |
ATTACHMENT JL5A Indirect Rates Build Up Form.docx | DOCX | Aug 20, 2020 | |
ATTACHMENT JL6 Proposed Historical and Year to Date Ind Rates.docx | DOCX | Aug 20, 2020 | |
ATTACHMENT JL6A SCA DBA Ceiling Labor Rates.doc | DOC | Aug 20, 2020 | |
ATTACHMENT JL7 AND JL7A COST MODEL AND SUMMARY.xlsx | XLSX | Aug 20, 2020 | |
ATTACHMENT JL8 Proj Data Sheet.docx | DOCX | Aug 20, 2020 | |
ATTACHMENT JL10 Small Business Participation Commitment Document.docx | DOCX | Aug 20, 2020 | |
ATTACHMENT JL4 PROPOSED Distribution of work.docx | DOCX | Aug 20, 2020 |
INDEFINITE DELIVERY / INDEFINITE QUANTITY (IDIQ) GLOBAL CONTINGENCY CONSTRUCTION (GCC) MULTIPLE AWARD CONTRACT (MAC)
INDEFINITE DELIVERY / INDEFINITE QUANTITY (IDIQ) GLOBAL CONTINGENCY CONSTRUCTION (GCC) MULTIPLE AWARD CONTRACT (MAC)
Contact and place of performance
Amber Forehand-Hughes
Not specified
This requirement is for the Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC). Please see the attached documents for solicitation procedures regarding this requirement. - Amendment 0001 is issued to correct and update associated FARS / DFARS provisions and clauses. Please see attachment N6247020R5003 0001.pdf for more information. - Amendment 0002 is...
View moreThe Naval Facilities Engineering Systems Command (NAVFAC) Atlantic, under the Department of the Navy, issued solicitation N6247020R5003 for a Global Contingency Construction (GCC) Multiple Award Contract (MAC). This requirement utilizes an Indefinite Delivery / Indefinite Quantity (IDIQ) structure to provide construction services on a global scale. The procurement is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Y1JZ for Construction of Miscellaneous Buildings.
The scope of the contract involves contingency construction capabilities, with specific solicitation procedures, updated Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS) provisions, and technical requirements detailed across 28 attachments. These supporting documents include project data sheets, historical small business utilization records, proposed distribution of work forms, and small business participation commitment documents. Administrative amendments to the solicitation provided responses to formal inquiries and revised various secondary attachments related to indirect rates and data sheets.
The response deadline for this solicitation was October 27, 2020, following several extensions from the original posting on August 20, 2020. Amber Forehand-Hughes is the designated point of contact for this procurement. There are no specific set-asides or geographic places of performance identified in the notice metadata beyond the global nature of the contingency construction requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.