Name | Type | Posted | Actions |
|---|---|---|---|
DID81838MGMT.pdf | Feb 13, 2020 | ||
DIDMGMT80441C.pdf | Feb 13, 2020 | ||
Package_Requirement.pdf | Feb 13, 2020 | ||
CDRL.pdf | Feb 13, 2020 | ||
DIDPSSS81534A.pdf | Feb 13, 2020 | ||
Transport_Data.pdf | Feb 13, 2020 | ||
Item_Description.pdf | Feb 13, 2020 | ||
DIDPSSS81995.pdf | Feb 13, 2020 | ||
FA811720R0008.pdf | Feb 13, 2020 | ||
DIDSESS80619D.pdf | Feb 13, 2020 | ||
DIDMISC81832.pdf | Feb 13, 2020 | ||
PWS.pdf | Feb 13, 2020 | ||
DIDMGMT80969.pdf | Feb 13, 2020 | ||
DIDPSSS81656B.pdf | Feb 13, 2020 |
Repair of F-16 Engine Start Controller
Contact and place of performance
Matthew Simon
Not specified
Seven Year Delivery Repair Contract: The Contractor shall provide the necessary labor, materials, parts, facilities and equipment required to disassemble, analyze, troubleshoot, repair, and test assets, assemblies and/or parts that are maintained or repaired under this contract. These services also include alignment, adjustment, calibration, testing, movement, storage and reporting status related services to the repa...
View moreThe Department of the Air Force, specifically the AFSC PZABA office, has issued solicitation FA811720R0008 for the repair of the F-16 Engine Start Controller. This requirement is classified under NAICS code 336413, Other Aircraft Parts and Auxiliary Equipment Manufacturing, and PSC J066, MAINT/REPAIR/REBUILD OF EQUIPMENT- INSTRUMENTS AND LABORATORY EQUIPMENT. The procurement is structured as a seven-year delivery repair contract. Interested parties must submit their responses by the deadline of March 13, 2020.
The selected contractor is responsible for providing all labor, materials, parts, facilities, and equipment necessary to disassemble, analyze, troubleshoot, repair, and test the designated assets and assemblies. Scope of work includes alignment, adjustment, calibration, and status reporting to ensure items are returned to the government in serviceable condition with original form, fit, and function. All repaired units must meet original equipment manufacturer specifications as validated by final acceptance testing.
The contract requires updating hardware and software to the latest government-approved configurations and replacing any component parts that fail inspection or show signs of fatigue or deterioration at the contractor's expense. The solicitation includes 14 attachments, such as the Package Requirement, CDRL, Transport Data, and various Data Item Descriptions. Matthew Simon serves as the primary point of contact for this notice, which was published and last updated on February 13, 2020.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.