Name | Type | Posted | Actions |
|---|---|---|---|
Amendment 0003 26B0010.pdf | Jun 2, 2026 | ||
Amendment 0002 26B0010.pdf | May 26, 2026 | ||
Amendment 0001 26B0010.pdf | Apr 30, 2026 | ||
N4008526B0010.pdf | Apr 27, 2026 | ||
7357358 DrawingsAsOne.pdf | Apr 27, 2026 | ||
7357358 SpecsAsOne.pdf | Apr 27, 2026 | ||
N4008526B0010.pdf | Apr 27, 2026 |
FRCE: Site Prep for Ultrasonic Degreaser B133
FRCE: Site Prep for Ultrasonic Degreaser B133
The Department of the Navy, through NAVFACSYSCOM Mid-Atlantic, is soliciting bids for the preparation of Building 133 at Marine Corps Air Station (MCAS) Cherry Point to accommodate a new ultrasonic cleaning system. The project scope involves furnishing and installing an ultrasonic degreaser and a supporting chiller, alongside comprehensive site preparation work. This construction effort includes concrete demolition, the installation of new concrete structures, and the integration of electrical and plumbing utilities. The supporting chiller is designated for installation on the roof of the facility. The solicitation, issued as a formal invitation for bids, requires the contractor to manage complex technical requirements including the construction of a watertight vault and the application of specialized chemical-resistant coatings. The project magnitude is estimated between $1,000,000 and $500,000,000, with performance taking place at Fleet Readiness Center East (FRCE) in North Carolina. Bids are due by June 8, 2026, following an extension provided in the amendment package. The attachment package provides a comprehensive technical foundation, including a 19-sheet drawing set and a detailed specification package covering Divisions 00 through 31. Three subsequent amendments have been issued to clarify technical inquiries, incorporate new federal clauses regarding diversity, equity, and inclusion, and specify requirements for solvent-resistant coatings on concrete pit surfaces. Project 7357358 involves facility preparation and the installation of an ultrasonic cleaning system at Building 133, MCAS Cherry Point. The technical framework is defined by a base solicitation, 19 engineering drawings, and a comprehensive specification package. The contractor is responsible for th…
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Eileen Mieko Cole
Cherry Point, NC 28533
USA
The work includes furnishing and installation of an ultrasonic cleaning system and supporting chiller. Work will include concrete demolition, new concrete, electrical and plumbing utilities, and roof work. Chiller will be located on roof.