Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| IGF::OT::IGF ARMY PUBLICATION CENTER; OVERLAND, MO, THE PROJECT WILL BE PERFORMED TO CONDUCT ROOF REPAIRS AND ROOF REPLACEMENTS TO MULTIPLE BUILDINGS AS NECESSARY TO ADD AN ADDITIONAL SEVEN TO EIGHT YEARS OF USEFUL LIFE UNTIL A PLANNED CAPITAL PROJECT IS UNDERTAKEN IN THE YEAR 2022. THE BALLASTED EPDM ROOFING SYSTEM AT BLDG. 201, THE MAIN ONE STORY WAREHOUSE FACILITY, WAS INSTALLED IN 2004 AND GENERALLY IS IN SATISFACTORY CONDITION EXCEPT IN CERTAIN AREAS; PARTICULARLY FLASHING AREAS AROUND EQUIPMENT CURBS AND PITCH POCKETS AND WILL BE REPAIRED. THE ROOF OF THE OFFICE PORTION IS ALSO A BALLASTED EPDM ROOF AND WAS INSTALLED BY THE FIELD OFFICE JUST PRIOR TO 2004; PROBABLY IN 2003, AND WILL BE REPAIRED. THE LOWER ROOF AREA OF BLDG. 208 WILL ALSO BE REPAIRED. BLDG. 204, THE CAMPUS GUARD SHACK, IS A FOUR PLY BUILT-UP ROOF INSTALLED IN 1975 AND WILL BE TORN OFF AND REPLACED WITH A FULLY ADHERED EPDM ROOF SYSTEM; AS AN OPTION. | J L BROWN CONTRACTING SERVICE INC | $362,817 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jun 23, 2015 | Jun 23, 2015 | Jan 4, 2016 | ||
| IGF::OT::IGF ROMAN L. HRUSKA FEDERAL COURTHOUSE, 111 S. 18TH PLZ., OMAHA, NE AWARD TO REPLACE WINDOWS AT ABOVE ADDRESS. | J L BROWN CONTRACTING SERVICE INC | $795,090 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jun 19, 2015 | Jun 19, 2015 | Dec 27, 2016 | ||
| IGF::OT::IGF MISC REPAIRS AT NOSC ST. LOUIS THE WORK INCLUDES PAINTING, FLOORING REPLACEMENT, LIFE SAFETY ENHANCEMENTS, RESTROOM AND LOCKER ROOM RENOVATIONS, AND OTHER MISCELLANEOUS REPAIRS AND UPGRADES WITH INCIDENTAL RELATED WORK. THE WORK SHALL BE LOCATED AT NAVAL SUPPORT ACTIVITY MID-SOUTH, MILLINGTON, TN. | J L BROWN CONTRACTING SERVICE INC | $1,270,884 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 236220Commercial and Institutional Building Construction | Z1AZMAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | Sep 19, 2014 | Sep 19, 2014 | Jun 7, 2016 | ||
| IGF::OT::IGF BOIS BRULE MO CHUTE DITCHING AND CULVERT | J L BROWN CONTRACTING SERVICE INC | $847,545 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237990Other Heavy and Civil Engineering Construction | Z2KZREPAIR OR ALTERATION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES | Sep 16, 2014 | Sep 16, 2014 | Sep 14, 2015 | ||
| IGF::OT::IGF PL 84-99 IL RIVER PROJECTS WORK AREA 2 | J L BROWN CONTRACTING SERVICE INC | $139,072 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237990Other Heavy and Civil Engineering Construction | Z2KZREPAIR OR ALTERATION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES | Jun 26, 2014 | Jun 26, 2014 | Jun 26, 2015 | ||
| IGF::OT::IGF PL 84-99 KASKASKIA ISLAND SLIDE REPAIR, KASKASKIA ISLAND, IL | J L BROWN CONTRACTING SERVICE INC | $189,987 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237990Other Heavy and Civil Engineering Construction | Z2QAREPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) | May 16, 2014 | May 16, 2014 | Jul 28, 2014 | ||
| IGF::OT::IGF PL 84-99 WORK AREA 1 - COLUMBIA SLIDE REPAIR, COLUMBIA, IL | J L BROWN CONTRACTING SERVICE INC | $28,987 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237990Other Heavy and Civil Engineering Construction | Z2QAREPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) | May 16, 2014 | May 16, 2014 | Jul 28, 2014 | ||
| IGF::OT::IGF PL 84-99 IL RIVER PROJECTS WORK AREA 2 | J L BROWN CONTRACTING SERVICE INC | $92,303 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237990Other Heavy and Civil Engineering Construction | Z2KZREPAIR OR ALTERATION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES | Apr 24, 2014 | Apr 24, 2014 | Apr 24, 2015 | ||
| IGF::OT::IGF PL 84-99 - WORK AREA 1 - TASK ORDER 0001 - WOOD RIVER, IL SLIDE REPAIR | J L BROWN CONTRACTING SERVICE INC | $316,045 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237990Other Heavy and Civil Engineering Construction | Z2QAREPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) | Apr 17, 2014 | Apr 17, 2014 | Aug 1, 2014 | ||
| IGF::OT::IGF WINFIELD LEVEE DISTRICT (BREACH) | J L BROWN CONTRACTING SERVICE INC | $1,001,858 | DEPT OF THE ARMY | US ARMY CORPS OF ENGINEERS - CIVIL PROGRAM FINANCING ONLY | — | 237990Other Heavy and Civil Engineering Construction | Z2KZREPAIR OR ALTERATION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES | Feb 25, 2014 | Feb 24, 2014 | Sep 25, 2016 | ||
| PROVIDING LABOR AND MATERIALS TO CLEAN AND RESEED VALLEY PARK LEVEE DISTRICT'S KENA STREET, VALLEY PARK, MO. PROJECT NO.:113931 | J L BROWN CONTRACTING SERVICE INC | $34,380 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 238990All Other Specialty Trade Contractors | F999OTHER ENVIRONMENTAL SERVICES | Sep 18, 2013 | Sep 18, 2013 | Sep 30, 2014 | ||
| IGF::OT::IGF FABRIC PANEL REPLACEMENT (SIA00024) DES MOINES U.S. COURTHOUSE 123 E WALNUT ST DES MOINES, IA PROJECT DESCRIPTION: THIS CONTRACT IS AWARDED TO J. L. BROWN CONTRACTING. IT WILL ADDRESS AND RESTORE THE DETERIORATED FINISHES IN THE PUBLIC ENTRY SPACES WITHIN THIS NATIONAL REGISTERS OF HISTORIC PLACES LISTED BUILDING. | J L BROWN CONTRACTING SERVICE INC | $102,241 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Sep 18, 2013 | Sep 18, 2013 | Mar 16, 2014 | ||
| ROOF REPLACEMENT | J L BROWN CONTRACTING SERVICE INC | $139,000 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 238160Roofing Contractors | Z2PAREPAIR OR ALTERATION OF RECREATION FACILITIES (NON-BUILDING) | Jul 18, 2013 | Jul 17, 2013 | Sep 30, 2013 | ||
| IGF::OT::IGF CAFETERIA DEMOLITION PROJECT FOR BUILDING 103F AT THE FEDERAL CENTER COMPLEX, 4300 GOODFELLOW BLVD., STL MO. | J L BROWN CONTRACTING SERVICE INC | $0 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Apr 1, 2013 | Apr 1, 2013 | Aug 31, 2013 | ||
| IGF::OT::IGF - 27TH FLOOR WINDOW FILM PROJECT @ THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH ST., ST. LOUIS, MO 63102 | J L BROWN CONTRACTING SERVICE INC | $6,495 | PUBLIC BUILDINGS SERVICE | ADMINISTRATIVE OFFICE OF THE US COURTS | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Mar 6, 2013 | Mar 6, 2013 | Apr 8, 2013 | ||
| IGF::OT::IGF RMO00463 WHITTAKER U.S. COURTHOUSE KANSAS CITY, MO NEW AWARD J.L. BROWN CONTRACTING SERVICE, INC. PERIOD OF PERFORMANCE: 60 CALENDAR DAYS | J L BROWN CONTRACTING SERVICE INC | $0 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Feb 20, 2013 | Feb 25, 2013 | May 30, 2013 | ||
| FY12 MCLD/CENTAUR ROAD RAISE CONSTRUCTIO | J L BROWN CONTRACTING SERVICE INC | $1,450,098 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237990Other Heavy and Civil Engineering Construction | Y1KZCONSTRUCTION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES | Sep 25, 2012 | Sep 25, 2012 | Sep 23, 2014 | ||
| KASKASKIA ISLAND LEVEE REPAIR - STE GENEVIEVE COUNTY, ST MARY, MISSOURI | J L BROWN CONTRACTING SERVICE INC | $580,113 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237990Other Heavy and Civil Engineering Construction | Z2PZREPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES | Sep 24, 2012 | Sep 25, 2012 | Apr 15, 2013 | ||
| RMO00471, OVERLAND, MO IGF::OT::IGF J L BROWN CONTRACTING SERVICE, INC., NEW AWARD PERIOD OF PERFORMANCE - 90 CALENDAR DAYS | J L BROWN CONTRACTING SERVICE INC | $337,794 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Sep 19, 2012 | Sep 19, 2012 | Jan 2, 2013 | ||
| CONTRACTOR TO REPAIR THE SKY LIGHT SOFFIT WALLS IN THE PREVEDEL BUILDING, B. 109, AT THE FEDERAL RECORDS CENTER, 9700 PAGE BLVD., ST. LOUIS, MO 63132. | J L BROWN CONTRACTING SERVICE INC | $98,939 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Aug 23, 2012 | Aug 23, 2012 | Jan 28, 2013 | ||
| SOLDIER BEAM WALL CAPPING | J L BROWN CONTRACTING SERVICE INC | $31,000 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237990Other Heavy and Civil Engineering Construction | Y1KACONSTRUCTION OF DAMS | Aug 15, 2012 | Aug 14, 2012 | Sep 4, 2012 | ||
| APPLIED RIVER ENGINEERING CENTER LABORATORY BUILDING (AREC), USACE MVS SERVICE BASE, ST. LOUIS, MO | J L BROWN CONTRACTING SERVICE INC | $1,852,548 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Y142 | Sep 27, 2011 | Sep 27, 2011 | Apr 12, 2013 | ||
| ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS CONTRACT INCLUDES BUT IS NOT LIMITED TO: SPACE FIT-OUT FOR THE SBA ST. LOUIS OFFICE. | J L BROWN CONTRACTING SERVICE INC | $532,896 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z111 | Jul 8, 2011 | Jul 8, 2011 | Jul 8, 2013 | ||
| BUILDING 8 REHAB US ARMY CORPS OF ENIGNEERS SERVICE ABSE, ST. LOUIS, MO | J L BROWN CONTRACTING SERVICE INC | $762,393 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 332311Prefabricated Metal Building and Component Manufacturing | Y199 | Sep 28, 2009 | Sep 28, 2009 | Dec 10, 2010 | ||
| STRUCTURAL REPAIR WORK AT CANNON DAM | J L BROWN CONTRACTING SERVICE INC | $987,712 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237310Highway, Street, and Bridge Construction | Z221 | Sep 25, 2009 | Sep 24, 2009 | May 31, 2013 |