Hulah Lake Toe Drain, Bowring, Oklahoma
Contact and place of performance
Tyler HASTINGS
74056
PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system inc...
View moreThe Department of the Army, U.S. Army Corps of Engineers Tulsa District, is soliciting bids for the Hulah Lake Toe Drain project located in Bowring, Oklahoma. This requirement, identified under solicitation number W912BV25RA004, is designated as a total Small Business Set-Aside (SBA). The project falls under NAICS code 237990, Other Heavy and Civil Engineering Construction, and PSC Z1KA, Maintenance of Dams. Responses to this solicitation are due by July 30, 2025.
The scope of work involves the demolition and reconstruction of infrastructure associated with the dam's toe drain system. Primary tasks include the demolition of existing toe drain piping, manholes, and relief well connections, excluding the section between manholes 6 and 8. Additionally, three existing toe road culverts, including their pipes and flare ends, will be removed.
New construction consists of installing a toe drain system featuring perforated piping, non-perforated relief well and connector piping, and precast concrete manholes that tie into existing manholes 6 and 8. The contractor will also construct new toe road culverts using reinforced concrete pipe and precast flared ends, supported by riprap. One attachment, a sign-in sheet from July 11, 2025, is associated with this notice. Tyler Hastings serves as the primary point of contact for this solicitation.