Hulah Lake Toe Drain, Bowring, Oklahoma
Hulah Lake Toe Drain, Bowring, Oklahoma
Contact and place of performance
Tyler HASTINGS
74056
PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system inc...
View moreThe Department of the Army, Engineering District Tulsa, is soliciting services for the Hulah Lake Toe Drain project in Bowring, Oklahoma. This solicitation, identified by number W912BV25RA004, is designated as an SBA (SBA) set-aside and falls under NAICS code 237990 for Other Heavy and Civil Engineering Construction and PSC Z1KA for Maintenance of Dams. The project scope encompasses the demolition and replacement of existing toe drain systems and road culverts to maintain dam infrastructure.
Work requirements include the demolition of the existing toe drain system, including piping, manholes, and relief well connections, while excluding the section between manholes 6 and 8. Contractors must also remove three existing toe road culverts, including culvert pipes and flare ends. New construction activities involve installing a replacement toe drain system consisting of perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and relief well connector piping that ties into the existing manholes. The project also requires the installation of new reinforced concrete pipe culverts with pre-cast flared ends and surrounding riprap.
The response deadline for this solicitation is July 30, 2025. Tyler Hastings is the point of contact for this requirement. Contract documentation includes one attachment, a sign-in sheet from July 11, 2025.