Name | Type | Posted | Actions |
|---|---|---|---|
Sign in Sheet.pdf | Jul 11, 2025 | ||
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 25, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912BV25RA004¬iceType=SolicitationNotice | LINK | Jun 25, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Jun 25, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 25, 2025 |
Hulah Lake Toe Drain, Bowring, Oklahoma
Hulah Lake Toe Drain, Bowring, Oklahoma
Contact and place of performance
Tyler HASTINGS
74056
PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system inc...
View moreThe Department of the Army, specifically the U.S. Army Corps of Engineers Tulsa District (W076 ENDIST TULSA), is seeking services for the maintenance of dams under solicitation number W912BV25RA004. This project involves the demolition and reconstruction of infrastructure, including the removal of existing toe drain systems such as piping, manholes, and relief well connections, while preserving the system between manholes 6 and 8. Additionally, the scope requires the demolition of three existing toe road culverts and their associated flare ends.
Construction activities include the installation of a new toe drain system featuring perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and relief well connector piping that integrates with existing manholes 6 and 8. New toe road culverts will be installed using reinforced concrete pipe, pre-cast flared ends, and riprap for stabilization. This requirement is categorized under NAICS code 237990, Other Heavy and Civil Engineering Construction, and PSC Z1KA, Maintenance of Dams.
This opportunity is designated as a Small Business Administration (SBA) set-aside. Interested parties must submit responses by the deadline of July 30, 2025. Tyler Hastings serves as the point of contact for this notice, which includes one attachment, a sign-in sheet posted on July 11, 2025.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.