Name | Type | Posted | Actions |
|---|---|---|---|
Sign in Sheet.pdf | Jul 11, 2025 | ||
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 25, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912BV25RA004¬iceType=SolicitationNotice | LINK | Jun 25, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Jun 25, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 25, 2025 |
Hulah Lake Toe Drain, Bowring, Oklahoma
Contact and place of performance
Tyler HASTINGS
74056
PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system inc...
View moreThe U.S. Department of the Army, Corps of Engineers Tulsa District, is soliciting bids for the Hulah Lake Toe Drain project located in Bowring, Oklahoma. This requirement, identified under solicitation number W912BV25RA004, is designated as an SBA Small Business Administration set-aside. The project falls under NAICS code 237990 for Other Heavy and Civil Engineering Construction and PSC Z1KA for Maintenance of Dams. Responses to this solicitation are due by July 30, 2025.
The scope of work involves the demolition and reconstruction of the facility’s toe drain and road culvert systems. Specific tasks include the removal of existing toe drain piping, manholes, and relief well connections, excluding the system between manholes 6 and 8, as well as the demolition of three existing toe road culverts. Construction requirements include installing a new toe drain system featuring perforated toe drain piping, non-perforated relief well and connector piping, and precast concrete manholes designed to tie into existing infrastructure. Additionally, the contractor will construct new toe road culverts using reinforced concrete pipe, pre-cast flared ends, and riprap.
Administrative details for this notice include a sign-in sheet attachment posted on July 11, 2025. Tyler Hastings serves as the primary point of contact for the solicitation. The project was originally published on June 25, 2025, and underwent its most recent update on July 23, 2025.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.