Name | Type | Posted | Actions |
|---|---|---|---|
Q and A.pdf | May 7, 2026 | ||
1240LT26Q0046 A0001.pdf | Apr 28, 2026 | ||
Attchment 3 Comanche_Specifications v2.pdf | Apr 28, 2026 | ||
Comanche Site Visit.pdf | Apr 28, 2026 | ||
Q and A.pdf | Apr 28, 2026 | ||
Attachment 5 Wage Determination.pdf | Apr 10, 2026 | ||
Attachment 4 Maps and Drawaings.pdf | Apr 10, 2026 | ||
Attachment 1 SOI.pdf | Apr 10, 2026 | ||
1240LT26Q0046.pdf | Apr 10, 2026 | ||
Attachment 2 SOW.pdf | Apr 10, 2026 | ||
Attachment 3_Comanche_Specifications.pdf | Apr 10, 2026 |
Comanche Park Campground Reconstruction
Contact and place of performance
Erick Plamann
Custer, SD 57730
USA
POC Erick Plamann, Contract Specialist, [email protected] Comanche Park Campground Reconstruction The contractor will provide all labor, materials, and equipment for the campground improvement of 20 sites to 34 sites to include a road modification with curve widening and shaping for drainage and new surfacing. The Host Site and Volunteer Site will be relocated and upgraded with power, water and wa...
View moreQuestions and Answers updated
The Forest Service is soliciting a project for the reconstruction of the Comanche Park Campground in Custer, South Dakota, with a construction magnitude estimated between $1,000,000 and $5,000,000. The contractor will provide all labor, materials, and equipment to expand the facility from 20 to 34 sites, including road modifications for curve widening, drainage shaping, and new surfacing. The scope includes relocating and upgrading the Host and Volunteer sites with power, water, and wastewater vaults, and replacing five original 1965 stick-built toilets with four new pre-cast vault toilets.
The water system portion of the project involves decommissioning the existing pumphouse and installing a new pre-cast concrete treatment building equipped with upgraded plumbing and controls. Further technical requirements include removing an existing aboveground water storage tank and installing a new below-ground fiberglass storage tank, replacing all distribution piping, and installing new hydrants. This requirement is identified as NAICS 237110 Water and Sewer Line and Related Structures Construction and PSC Y1NE CONSTRUCTION OF WATER SUPPLY FACILITIES.
This combined synopsis/solicitation is issued under solicitation number 1240LT26Q0046 as an SBA Small Business Administration (SBA) set-aside. Responses are due by May 11, 2026. The procurement record includes 11 attachments, including specifications, site visit information, wage determinations, and question-and-answer documents. Erick Plamann is the designated point of contact for this solicitation.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.