Name | Type | Posted | Actions |
|---|---|---|---|
Final Call for Solution PPTS (20May2026).docx | DOCX | May 20, 2026 | |
Attachment 0002 PPTS Capabilities Assertion Matrix.xlsx | XLSX | May 19, 2026 | |
Final Call for Solution PPTS (19May2026).docx | DOCX | May 19, 2026 | |
Updated PPTS Questions and Answers 15MAY2026.xlsx | XLSX | May 15, 2026 | |
Final Call for Solution PPTS (14May2026).docx | DOCX | May 14, 2026 | |
Final AOS Statement of Objectives PPTS (14May2026).docx | DOCX | May 14, 2026 | |
Questions and answers 14May2026.xlsx | XLSX | May 14, 2026 | |
CPE CBRND Industry Day_BCIS-PPTS-SIS_1-1 Attendeees_18MAR26.pdf | Apr 9, 2026 | ||
Questions and answers PPTS.xlsx | XLSX | Apr 9, 2026 | |
AOS Statement of Objectives PPTS_Final Draft (2026-03-12)..docx | DOCX | Mar 12, 2026 | |
Final Draft Call for Solution PPTS 12MAR2026..docx | DOCX | Mar 12, 2026 |
Portable Patient Transport System (PPTS) Final
Portable Patient Transport System (PPTS) Draft
Contact and place of performance
Dan Adams
Natick, MA
USA
See 20MAY2026 Update below This draft Call for solutions is associated with the Army's Open Solicitation, W9128Z-25-S-A002. Please see the referenced link for more information. (https://sam.gov/opp/476c4481dc56499c9b1d9c6a9ce745a9/view). Call for Solutions (CFS) Number: W911QY-26-S-PPTS-01 Issuing Office: U.S. Army Contracting Command-Aberdeen Proving Ground (ACC-APG), Natick Contracting Division (NCD) Date Issue...
View moreThe details can be found in Attachments: AOS Statement of Objectives PPTS_Final Draft (2026-03-12). and Final Draft Call for Solution PPTS 12MAR2026..
Inquiries and Questions
Agreements Officer: Dan Adams (email:[email protected])
Agreements Specialist: Christine Halamoutis (email; [email protected])
Updated April 1, 2026
The government plans to post Questions and Answers (Q&A) that have been received for PPTS by April 7, 20226. The draft CFS and SOO will be updated to remove "draft" and a final CFS due date will be posted.
Updated April 8, 2026
Questions and Answers (Q&A) will be provided in the Q&A attachment
The draft CFS and SOO have not been finalized, once they have been, they will be posted and marked as final.
14MAY2026 Update
This call is no longer in draft status. The Final SOO, CFS and updated Q&A's have been posted in the attachments.
Questions in regard to this finalized Call must be submitted before 5:00PM on 19 May 2026.
Submissions are due by 4:00PM on 03 June 2026.
14MAY2026 Update
This call is no longer in draft status. The Q&A's have been posted in the attachments, dated 15MAY2026.
Questions in regard to this finalized Call must be submitted before 5:00PM on 19 May 2026.
Submissions are due by 4:00PM on 03 June 2026.
19MAY2026 Update
The CFS has been revised to reference Attachment 0002 PPTS Capabilities Assertion Matrix
Attachment 0002 PPTS Capabilities Assertion Matrix has been included
Questions in regard to this finalized Call must be submitted before 5:00PM on 19 May 2026.
Submissions are due by 4:00PM on 03 June 2026.
20MAY2026 Update
The CFS has been revised to clarify when a Bill of Materials (BOM) will be required. Final Call for Solution PPTS (20May2026)
The U.S. Army Contracting Command-Aberdeen Proving Ground (ACC-APG), Natick Contracting Division, has issued a final Call for Solutions (CFS) for a prototype Portable Patient Transport System (PPTS). Issued under the authority of 10 U.S.C. § 4022 for prototype projects, this solicitation is associated with the Army’s Open Solicitation W9128Z-25-S-A002. The government intends to award multiple Prototype Other Transaction (OT) Agreements to offerors whose solution briefs are most advantageous based on established evaluation criteria. Work is centered in Natick, Massachusetts, and the procurement is classified under NAICS 339113, Surgical Appliance and Supplies Manufacturing, and PSC 4240, Safety and Rescue Equipment.
The objective of this notice is to invite interested parties to submit a solution brief detailing a prototype PPTS that aligns with the project’s Statement of Objectives. The solicitation process involves 11 supporting documents, including a capabilities assertion matrix and a final call for solution revised on May 20, 2026, to clarify requirements for a Bill of Materials. No specific set-aside is designated for this procurement.
Submissions are due by 4:00 PM Eastern Time on June 3, 2026. The performance of this effort is tracked under solicitation number W911QY-26-S-PPTS-01, with Dan Adams serving as the primary point of contact. This final call follows a series of updates to the draft status and a formal question-and-answer period that concluded in May 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.