Name | Type | Posted | Actions |
|---|---|---|---|
W912PL25B0004_Abstract_Redondo_Breakwater_Repair_08Aug2025_-signed.pdf | Aug 11, 2025 | ||
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912PL25B0004¬iceType=SolicitationNotice | LINK | Jun 30, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 30, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Jun 30, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 30, 2025 |
NORTH BREAKWATER REPAIRS AT REDONDO BEACH-KING HARBOR
Contact and place of performance
Cameron Stokes
90277
Update 0007 to transmit SF30 of Amendment 0004 for IFB W912PL25B0004, amendment does not extend the bid opening date of 8/8/2025. Update 0006 is to transmit the SF30 of Amendment 0003 for the IFB W912PL25B0004, this amendment does not extend the bid opening date. This is to revise Table of Contents, revise Section 35 31 23 Breakwaters, and replace plan sheets CN101, CN102, CN302, CN303 and CN304. Update 0005 is for i...
View moreThe Department of the Army, specifically the U.S. Army Corps of Engineers Los Angeles District, is soliciting sealed bids for the repair of the north breakwater at Redondo Beach-King Harbor in Los Angeles County, California. This project involves restoring a shore-connected, rubble-mound breakwater to its original design elevations and slopes to ensure continued protection from ocean waves. Work includes resetting existing armor stone and the furnishing and placement of approximately 8,000 tons of new armor stone with a median size of 14 tons. Additionally, the contractor will repair an armor stone bench on the harborside of the structure located at an elevation of +10.0 feet MLLW. The estimated magnitude of construction is between $5,000,000 and $10,000,000, with an anticipated performance period of 210 calendar days.
This solicitation is identified under number W912PL25B0004 and is classified under NAICS code 237990 for Other Heavy and Civil Engineering Construction and PSC Z2KZ for the repair or alteration of other conservation and development facilities. The acquisition is being conducted as an Unrestricted Sealed Bid under FAR Part 14. Large business offerors are required to submit a subcontracting plan if the award exceeds $1,500,000. Administrative updates have established a final bid opening date of August 8, 2025.
Recent amendments to the solicitation have revised the table of contents, technical specifications for breakwaters, price and payment procedures, and temporary environmental controls. These updates also included the distribution of survey data, site visit information, and updated plan sheets. Cameron Stokes serves as the primary point of contact for this requirement. The solicitation and associated documents, including an abstract of bids posted on August 11, 2025, are managed through the Procurement Integrated Enterprise Environment (PIEE).