Name | Type | Posted | Actions |
|---|---|---|---|
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Feb 15, 2024 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Feb 15, 2024 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911S224B8300 | LINK | Feb 15, 2024 | |
https://dodprocurementtoolbox.com/ | LINK | Feb 15, 2024 |
Roofing Requirements Contract
Roofing Requirements Contract
Contact and place of performance
Samara Johnson
Not specified
ATTENTION BIDDERS: Amendment attachments are accessed by clicking "PIEE Solicitation Module Link for W911S224B8300" within the "Attachments/Links" section of the SAM.gov posting. That link will take you to the PIEE solicitation module. Click "Download All Attachments" button to download a compressed (zipped) folder; solicitation amendment and revised documents will be in a subfolder named 0001. The Contractor shall p...
View moreThe Department of the Army, specifically the Mission and Installation Contracting Command (MICC) at Fort Drum, is soliciting bids for a roofing requirements contract under solicitation number W911S224B8300. This requirement is classified under NAICS 238160 for Roofing Contractors and PSC Z2QA for repair or alteration of restoration of real property (public or private). The procurement is designated as a HUBZone (HZC) set-aside. Interested parties must submit their responses by the deadline of March 20, 2024.
The selected contractor will provide all supervision, plant, labor, equipment, materials, and appliances necessary to repair and replace existing roofs on various building structures located at Fort Drum. The objective of the work is to ensure each facility is watertight and impervious to the weather. Operations include altering existing facilities to connect new work in a professional manner and repairing any government property damaged during performance at no additional cost. All work must be performed by skilled personnel in accordance with the Statement of Work, specifications, and drawings.
Before beginning performance, a preconstruction orientation will be held at Fort Drum, requiring the attendance of a contractor representative with the authority to sign contractual documents. Administrative details and amendments for this solicitation are managed through the PIEE solicitation module, which contains the necessary specifications and revised documents. Samara Johnson serves as the point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.