Name | Type | Posted | Actions |
|---|---|---|---|
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Feb 15, 2024 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Feb 15, 2024 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911S224B8300 | LINK | Feb 15, 2024 | |
https://dodprocurementtoolbox.com/ | LINK | Feb 15, 2024 |
Roofing Requirements Contract
Roofing Requirements Contract
Contact and place of performance
Samara Johnson
Not specified
ATTENTION BIDDERS: Amendment attachments are accessed by clicking "PIEE Solicitation Module Link for W911S224B8300" within the "Attachments/Links" section of the SAM.gov posting. That link will take you to the PIEE solicitation module. Click "Download All Attachments" button to download a compressed (zipped) folder; solicitation amendment and revised documents will be in a subfolder named 0001. The Contractor shall p...
View moreThe Department of the Army, specifically the Mission and Installation Contracting Command (MICC) at Fort Drum, is soliciting bids for a roofing requirements contract under solicitation number W911S224B8300. This requirement is classified under NAICS 238160 for Roofing Contractors and PSC Z2QA for Repair or Alteration of Restoration of Real Property (Public or Private). The solicitation is designated as a HUBZone (HZC) set-aside. Interested parties must submit their responses by the deadline of March 20, 2024.
The selected contractor will provide all supervision, plant, labor, equipment, materials, and appliances necessary to repair and replace existing roofs on various building structures located at Fort Drum. The objective of the work is to ensure each facility is watertight and impervious to weather elements. Contracted personnel must be skilled in the specific types of roofing work involved, and any existing facilities damaged during operations must be repaired or replaced by the contractor at no additional cost to the government.
Administrative requirements include a mandatory preconstruction orientation at Fort Drum prior to the start of performance, which must be attended by a contractor representative authorized to sign contractual documents. All formal solicitation amendments and revised documents are managed through the PIEE solicitation module linked in the official notice. Samara Johnson serves as the primary point of contact for this federal opportunity.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.