Roofing Requirements Contract
Contact and place of performance
Samara Johnson
Not specified
ATTENTION BIDDERS: Amendment attachments are accessed by clicking "PIEE Solicitation Module Link for W911S224B8300" within the "Attachments/Links" section of the SAM.gov posting. That link will take you to the PIEE solicitation module. Click "Download All Attachments" button to download a compressed (zipped) folder; solicitation amendment and revised documents will be in a subfolder named 0001. The Contractor shall p...
View moreThe Department of the Army, MICC-Fort Drum, issued solicitation W911S224B8300 for a roofing requirements contract at Fort Drum. This procurement is categorized under NAICS 238160 Roofing Contractors and PSC Z2QA REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE). The opportunity is designated as a HUBZone set-aside, identified by the HZC acronym and explanation. Responses are due by March 20, 2024, to the point of contact, Samara Johnson.
The selected contractor will provide all supervision, plant, labor, equipment, materials, and appliances necessary to repair and replace existing roofs on various building structures. The primary objective is to ensure each facility is watertight and impervious to weather elements. All work must be completed by skilled personnel, and any existing facilities damaged during operations must be repaired or replaced by the contractor at no cost to the government. When new work connects to existing structures, the contractor is responsible for making professional connections as required by the statement of work.
Prior to starting performance, the contractor must send a representative with signing authority to a preconstruction orientation at Fort Drum. Administrative documents, including solicitation amendments and revised specifications, are managed through the PIEE solicitation module. This requirements contract is subject to specific terms and conditions, drawings, and task order specifications provided by the agency.