Name | Type | Posted | Actions |
|---|---|---|---|
C.04.01 Bid Opening Worksheet -09-19-2023.pdf | Sep 19, 2023 | ||
B.08.03 Solicitation 23B00020003.pdf | Sep 12, 2023 | ||
B.08.03 V6_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V2_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V1_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V10_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V11_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V3_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V9_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V8_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V4_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V5_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V12_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 VA_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V7_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 TECHSPECS_23B0002_amd0003_McN Levee_8Sep23.pdf | Sep 12, 2023 | ||
B.08.03 DRAWING AMENDMENT APPROVAL FORM_0003.pdf | Sep 12, 2023 | ||
B.08.03 Solicitation 23B00020002.pdf | Aug 30, 2023 | ||
V6_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
B.08.02 Solicitation 23B00020001.pdf | Aug 22, 2023 | ||
TECHSPECS_23B0002_McN Levee Pump Stations_amd0001_21Aug23.pdf | Aug 22, 2023 | ||
V1_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V10_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V11_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V4_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V3_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V8_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V9_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V5_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V7_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
MNA Levee Drainage Pumps site visit list.pdf | Aug 15, 2023 | ||
A.03.09 V7_23B0002_Plans_RE007_8__.pdf | Aug 9, 2023 | ||
B.08.02 Solicitation 23B0002.pdf | Aug 3, 2023 | ||
A.03.09 V10_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V12_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V06_23B0002_Plans~.pdf | Aug 3, 2023 | ||
A.03.09 V09_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V08_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V07_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V04_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V03_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V02_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V01_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 VA_23B0002_Plans.pdf | Aug 3, 2023 | ||
B.08.02 Solicitation 23B0002.pdf | Aug 3, 2023 | ||
A.02.12 TECHSPECS_23B0002_McN Levee Pump Stations_7Feb23.pdf | Aug 3, 2023 | ||
A.03.09 V11_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V05_23B0002_Plans.pdf | Aug 3, 2023 |
MNA Levee Drainage Pump Upgrade
Contact and place of performance
Chandra D. Crow
Pasco, WA 99301
USA
9/19/23: Updated to provide the bid opening worksheet. 9/12/23: Amendment 0003 is uploaded. This amendment changes multiple areas in the drawings and specifications, corrects the buy american act clauses, and amends the bid due date. 8/30/23: Amendment 0002 is uploaded. This amendment changes the acquisition from an intended firm-fixed-price award to a fixed-price with Economic Price Adjustment. Please see amendment...
View moreThe US Army Corps of Engineers, Walla Walla District, issued this invitation for bid under solicitation number W912EF23B0002 for the McNary Levee Drainage Pumps project. The work involves construction services for pump house upgrades located at multiple sites across Pasco, Richland, and Kennewick, Washington. This requirement is classified under NAICS 237110 Water and Sewer Line and Related Structures Construction and PSC Y1NE Construction of Water Supply Facilities. The project is a total small business set-aside (SBA) with a construction magnitude estimated between $25,000,000 and $100,000,000.
The procurement was structured as a five-year construction requirements contract. While originally intended as a firm-fixed-price award, amendment 0002 transitioned the acquisition to a fixed-price with Economic Price Adjustment. The solicitation required 100% performance and payment bonds from the successful offeror. Administrative requirements included specific security clearance protocols for foreign nationals seeking to attend site visits, necessitating documentation such as passports or employment authorization forms for access to the project sites.
The response deadline for this solicitation was September 19, 2023. The government provided 48 attachments as part of the notice, including multiple volumes of plans, technical specifications, and the final bid opening worksheet. Contractual updates and amendments addressed changes to the drawings, corrections to Buy American Act clauses, and adjustments to the bid due date. Chandra D. Crow served as the primary point of contact for this federal opportunity.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.