Name | Type | Posted | Actions |
|---|---|---|---|
C.04.01 Bid Opening Worksheet -09-19-2023.pdf | Sep 19, 2023 | ||
B.08.03 Solicitation 23B00020003.pdf | Sep 12, 2023 | ||
B.08.03 V6_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V2_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V1_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V10_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V11_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V3_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V9_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V8_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V4_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V5_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V12_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 VA_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V7_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 TECHSPECS_23B0002_amd0003_McN Levee_8Sep23.pdf | Sep 12, 2023 | ||
B.08.03 DRAWING AMENDMENT APPROVAL FORM_0003.pdf | Sep 12, 2023 | ||
B.08.03 Solicitation 23B00020002.pdf | Aug 30, 2023 | ||
V6_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
B.08.02 Solicitation 23B00020001.pdf | Aug 22, 2023 | ||
TECHSPECS_23B0002_McN Levee Pump Stations_amd0001_21Aug23.pdf | Aug 22, 2023 | ||
V1_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V10_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V11_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V4_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V3_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V8_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V9_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V5_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V7_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
MNA Levee Drainage Pumps site visit list.pdf | Aug 15, 2023 | ||
A.03.09 V7_23B0002_Plans_RE007_8__.pdf | Aug 9, 2023 | ||
B.08.02 Solicitation 23B0002.pdf | Aug 3, 2023 | ||
A.03.09 V10_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V12_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V06_23B0002_Plans~.pdf | Aug 3, 2023 | ||
A.03.09 V09_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V08_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V07_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V04_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V03_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V02_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V01_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 VA_23B0002_Plans.pdf | Aug 3, 2023 | ||
B.08.02 Solicitation 23B0002.pdf | Aug 3, 2023 | ||
A.02.12 TECHSPECS_23B0002_McN Levee Pump Stations_7Feb23.pdf | Aug 3, 2023 | ||
A.03.09 V11_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V05_23B0002_Plans.pdf | Aug 3, 2023 |
MNA Levee Drainage Pump Upgrade
MNA Levee Drainage Pump Upgrade
Contact and place of performance
Chandra D. Crow
Pasco, WA 99301
USA
9/19/23: Updated to provide the bid opening worksheet. 9/12/23: Amendment 0003 is uploaded. This amendment changes multiple areas in the drawings and specifications, corrects the buy american act clauses, and amends the bid due date. 8/30/23: Amendment 0002 is uploaded. This amendment changes the acquisition from an intended firm-fixed-price award to a fixed-price with Economic Price Adjustment. Please see amendment...
View moreThe U.S. Army Corps of Engineers, Walla Walla District, issued this Invitation for Bid (IFB) for the McNary Levee Drainage Pumps construction project. The scope of work involves upgrading drainage pump houses at multiple locations across Pasco, Richland, and Kennewick, Washington. The project is classified under NAICS 237110 Water and Sewer Line and Related Structures Construction and PSC Y1NE Construction of Water Supply Facilities. The contract is structured as a five-year construction requirements contract with an estimated magnitude between $25,000,000 and $100,000,000. While initially planned as firm-fixed-price, the acquisition was amended to a fixed-price with Economic Price Adjustment.
This solicitation, identified by number W912EF23B0002, is a 100% Small Business Set-Aside (SBA). The government requires 100% performance and payment bonds for the duration of the work. Project documentation includes 48 attachments containing plans, technical specifications, and various amendments that addressed drawing revisions and Buy American Act clauses. The solicitation process included a site visit in August 2023, which required specific security clearance protocols for foreign nationals.
The response deadline for this opportunity was September 19, 2023. Administrative oversight for the procurement is managed by the Walla Walla office, with Chandra D. Crow serving as the primary point of contact. All primary performance activities occur in Pasco, Washington. The final project updates included the publication of a bid opening worksheet following the submission deadline.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.