Name | Type | Posted | Actions |
|---|---|---|---|
C.04.01 Bid Opening Worksheet -09-19-2023.pdf | Sep 19, 2023 | ||
B.08.03 Solicitation 23B00020003.pdf | Sep 12, 2023 | ||
B.08.03 V6_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V2_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V1_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V10_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V11_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V3_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V9_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V8_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V4_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V5_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V12_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 VA_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V7_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 TECHSPECS_23B0002_amd0003_McN Levee_8Sep23.pdf | Sep 12, 2023 | ||
B.08.03 DRAWING AMENDMENT APPROVAL FORM_0003.pdf | Sep 12, 2023 | ||
B.08.03 Solicitation 23B00020002.pdf | Aug 30, 2023 | ||
V6_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
B.08.02 Solicitation 23B00020001.pdf | Aug 22, 2023 | ||
TECHSPECS_23B0002_McN Levee Pump Stations_amd0001_21Aug23.pdf | Aug 22, 2023 | ||
V1_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V10_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V11_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V4_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V3_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V8_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V9_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V5_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V7_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
MNA Levee Drainage Pumps site visit list.pdf | Aug 15, 2023 | ||
A.03.09 V7_23B0002_Plans_RE007_8__.pdf | Aug 9, 2023 | ||
B.08.02 Solicitation 23B0002.pdf | Aug 3, 2023 | ||
A.03.09 V10_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V12_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V06_23B0002_Plans~.pdf | Aug 3, 2023 | ||
A.03.09 V09_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V08_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V07_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V04_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V03_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V02_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V01_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 VA_23B0002_Plans.pdf | Aug 3, 2023 | ||
B.08.02 Solicitation 23B0002.pdf | Aug 3, 2023 | ||
A.02.12 TECHSPECS_23B0002_McN Levee Pump Stations_7Feb23.pdf | Aug 3, 2023 | ||
A.03.09 V11_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V05_23B0002_Plans.pdf | Aug 3, 2023 |
MNA Levee Drainage Pump Upgrade
Contact and place of performance
Chandra D. Crow
Pasco, WA 99301
USA
9/19/23: Updated to provide the bid opening worksheet. 9/12/23: Amendment 0003 is uploaded. This amendment changes multiple areas in the drawings and specifications, corrects the buy american act clauses, and amends the bid due date. 8/30/23: Amendment 0002 is uploaded. This amendment changes the acquisition from an intended firm-fixed-price award to a fixed-price with Economic Price Adjustment. Please see amendment...
View moreThe U.S. Army Corps of Engineers, Walla Walla District, issued solicitation W912EF23B0002 for the McNary Levee Drainage Pumps construction project. This requirement involves upgrading drainage pump houses at multiple locations across Pasco, Richland, and Kennewick, Washington. The project is classified under NAICS 237110 Water and Sewer Line and Related Structures Construction and PSC Y1NE Construction of Water Supply Facilities. The procurement is a 100% small business set-aside (SBA) with an estimated construction magnitude between $25,000,000 and $100,000,000.
The government intends to award a fixed-price with Economic Price Adjustment five-year construction requirements contract. Performance requires 100% payment and performance bonds. The solicitation was conducted as an Invitation for Bid (IFB), with the final response deadline set for September 19, 2023. This procurement included specific security clearance protocols for foreign nationals attending site visits, requiring documentation such as passports or employment authorization forms for access to project locations in the Pasco area.
Administrative updates to the solicitation included 48 total attachments, such as revised plans, technical specifications, and a bid opening worksheet. Amendments to the notice modified the contract type from firm-fixed-price to fixed-price with Economic Price Adjustment, updated Buy American Act clauses, and adjusted the bid due date. Chandra D. Crow served as the primary point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.