No attachments available.
Z--IA-PORT LOUISA NWR-BOAT RAMP REPAIR PROJ
Contact and place of performance
Williams, Rachel
Not specified
IA-Port Louisa NWR Boat Ramp Project. Remove existing concrete boat ramp and replace with new concrete boat ramp. Amendment 1 makes the following 3 changes: 1) Quote due date; 3/27/2026. 2) Ramp dimensions are 12'x28'x6", a change from 8'x28'. 3) Period of Performance is April 27, 2026 to October 2, 2026 (to be coordinated with Contractor and Refuge Staff).
The US Fish and Wildlife Service, through the FWS Construction A/E Team 2, issued this award notice for the Port Louisa National Wildlife Refuge Boat Ramp Project under solicitation number 140FC226Q0014. The scope of work involves the removal of an existing concrete boat ramp and the installation of a new concrete replacement. The project specifications require ramp dimensions of 12 feet by 28 feet by 6 inches.
The requirement is classified under NAICS 238110 for Poured Concrete Foundation and Structure Contractors and PSC Z2PZ for Repair or Alteration of Other Non-Building Facilities. The performance period for this project is scheduled from April 27, 2026, to October 2, 2026, with the specific timeline to be coordinated between the contractor and refuge staff.
This notice was published on April 16, 2026, following a previous quote deadline of March 27, 2026. Rachel Williams is the designated point of contact for this award, which contains zero attachments. The work is localized to the Port Louisa National Wildlife Refuge and was finalized after revisions to the ramp dimensions and the submission schedule.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.