56--IA-PORT LOUISA NWR-BOAT RAMP REPAIR PROJ
Contact and place of performance
Williams, Rachel
Not specified
IA-Port Louisa NWR Boat Ramp Project. Remove existing concrete boat ramp and replace with new concrete boat ramp. Amendment 1 makes the following 3 changes: 1) Quote due date; 3/27/2026. 2) Ramp dimensions are 12'x28'x6", a change from 8'x28'. 3) Period of Performance is April 27, 2026 to October 2, 2026 (to be coordinated with Contractor and Refuge Staff).
The U.S. Fish and Wildlife Service, through the FWS Construction A/E Team 2, issued this award notice for the IA-Port Louisa NWR Boat Ramp Project under solicitation number 140FC226Q0014. The scope of work involves removing an existing concrete boat ramp and replacing it with a new concrete structure. Following updates in Amendment 1, the specifications for the new ramp were established at dimensions of 12 feet by 28 feet by 6 inches.
The project is classified under NAICS 238110 for Poured Concrete Foundation and Structure Contractors and PSC Z2PZ for the repair or alteration of other non-building facilities. The performance period is scheduled to run from April 27, 2026, through October 2, 2026, with specific timing to be coordinated between the contractor and refuge staff.
The notice was published on April 16, 2026, listing Rachel Williams as the primary point of contact. The solicitation process included a quote deadline of March 27, 2026. While the project is centered at the Port Louisa National Wildlife Refuge, there are zero attachments associated with this specific award notice entry.