Z--IA-PORT LOUISA NWR-BOAT RAMP REPAIR PROJ
Contact and place of performance
Williams, Rachel
Not specified
IA-Port Louisa NWR Boat Ramp Project. Remove existing concrete boat ramp and replace with new concrete boat ramp. Amendment 1 makes the following 3 changes: 1) Quote due date; 3/27/2026. 2) Ramp dimensions are 12'x28'x6", a change from 8'x28'. 3) Period of Performance is April 27, 2026 to October 2, 2026 (to be coordinated with Contractor and Refuge Staff).
The U.S. Fish and Wildlife Service, through the FWS Construction A/E Team 2, issued an award for the IA-Port Louisa NWR Boat Ramp Project under solicitation 140FC226Q0014. The scope of work involves removing an existing concrete boat ramp and replacing it with a new structure. Updated specifications for the project define the ramp dimensions as 12 feet by 28 feet by 6 inches.
The work is classified under NAICS 238110 for Poured Concrete Foundation and Structure Contractors and PSC Z2PZ for Repair or Alteration of Other Non-Building Facilities. The established period of performance runs from April 27, 2026, to October 2, 2026, with the schedule to be coordinated between the contractor and refuge staff.
The award notice was published and last updated on April 16, 2026, with Rachel Williams serving as the point of contact. This procurement previously included an amendment that adjusted the quote due date to March 27, 2026, and updated the ramp dimensions from the original 8-foot width to the current 12-foot width. No attachments are associated with this notice.