Installation of Washer and Dryer in Greenhouse
Contact and place of performance
Jim Roloff
Gastonia, NC 28054
USA
The AMS Science & Technology Program operates a greenhouse facility requiring the installation of a stacked washer and dryer to support laboratory and operational needs. The program already owns a Samsung front‑load washer and dryer set, which is compatible with stackable installation. A stacking kit needs to be supplied and installed as part of the project. The installation area is located along an exterior wall in the greenhouse entryway. Existing plumbing must be reconfigured, and new electrical, ventilation, and structural modifications are required.
Two sets of photos are posted below.
RFIs posted below.
Site visit attendance sheet posted below.
The USDA Animal and Plant Health Inspection Service (APHIS) MRPBS issued combined synopsis/solicitation 12639526Q0143 for the installation of laundry equipment at a greenhouse facility in Gastonia, North Carolina. This project supports the laboratory and operational requirements of the AMS Science & Technology Program. The procurement is designated as an SBA Small Business Administration set-aside under NAICS 238220 Plumbing, Heating, and Air-Conditioning Contractors and PSC Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS.
The scope of work involves installing a government-owned Samsung front-load washer and dryer set within the greenhouse entryway. The contractor must supply and install a compatible stacking kit and perform necessary structural modifications, electrical work, and ventilation updates. The project also requires the reconfiguration of existing plumbing along an exterior wall. Administrative documentation provided includes a statement of work, federal construction wage rates for Gaston County, and responses to requests for information.
The response deadline for this opportunity is June 10, 2026, following a notice update on June 3, 2026. Seven total attachments are associated with the solicitation, including project photos and a site visit attendance record. Jim Roloff serves as the point of contact for this requirement.