Name | Type | Posted | Actions |
|---|---|---|---|
W9127825RA078_Pre-Bid Site Visit Sign In Sheet.pdf | Mar 31, 2026 | ||
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 18, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 18, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9127825RA078¬iceType=CombinedSynopsisSolicitation | LINK | Mar 18, 2026 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 18, 2026 |
West Point Spillway Gate Painting
West Point Spillway Gate Painting
Contact and place of performance
Jeffrey Donaldson
31833
THIS IS A TOTAL SMALL BUSINESS SETASIDE. THIS PROJECT IS A STAND-ALONE ?C? TYPE, REQUEST FOR PROPOSAL (RFP), BEST VALUE SOURCE SELECTION SOLICITATION. Construction Order of Magnitude: Between $10,000,000 - $25,000,000 This project requires the Contractor to provide all labor, materials and equipment necessary to prep, prime and paint all metal components of the spillway gates, hoists and associated equipment. Paintin...
View moreThe Department of the Army, specifically the U.S. Army Corps of Engineers Mobile District, has issued a solicitation for the West Point Spillway Gate Painting project under solicitation number W9127825RA078. This requirement is a total small business set-aside (SBA) and will be conducted as a standalone "C" type Request for Proposal (RFP) using a best value source selection process. The project is classified under NAICS 237990: Other Heavy and Civil Engineering Construction and PSC Z2KA: REPAIR OR ALTERATION OF DAMS. Responses are due by April 23, 2026.
The scope of work involves providing all labor, materials, and equipment required to prepare, prime, and paint all metal components of the spillway gates, hoists, and associated equipment. Specific tasks include blasting and painting structures, performing minor structural girder modifications, installing or replacing rubber seals and cathodic protection anodes, and conducting weld repairs. Additionally, the contractor must remove and replace seal assemblies on a new set of stoplogs and provide a maintenance overcoat paint for both new and old stoplog sets. The estimated magnitude of construction is between $10,000,000 and $25,000,000.
Contractors must utilize a critical path method for project scheduling and should be aware that the solicitation includes bid options that may not be awarded. Jeffrey Donaldson serves as the primary point of contact for this notice. Metadata indicates two attachments have been provided: a pre-bid site visit sign-in sheet and a PDF document containing the solicitation details. All bid submissions, including bonds and standard forms, must be submitted in electronic format.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.