West Point Spillway Gate Painting
Contact and place of performance
Jeffrey Donaldson
31833
THIS IS A TOTAL SMALL BUSINESS SETASIDE. THIS PROJECT IS A STAND-ALONE ?C? TYPE, REQUEST FOR PROPOSAL (RFP), BEST VALUE SOURCE SELECTION SOLICITATION. Construction Order of Magnitude: Between $10,000,000 - $25,000,000 This project requires the Contractor to provide all labor, materials and equipment necessary to prep, prime and paint all metal components of the spillway gates, hoists and associated equipment. Paintin...
View moreThe Department of the Army, W074 ENDIST Mobile, is soliciting proposals for the West Point Spillway Gate Painting project under solicitation number W9127825RA078. This requirement is a total small business set-aside (SBA) and is being conducted as a stand-alone "C" type Request for Proposal (RFP) using best value source selection. The project falls under NAICS code 237990, Other Heavy and Civil Engineering Construction, and PSC Z2KA, Repair or Alteration of Dams. The construction order of magnitude is estimated between $10,000,000 and $25,000,000, requiring a critical path method for project management and the inclusion of bid options that may or may not be awarded.
The scope of work requires the contractor to provide all labor, materials, and equipment to prepare, prime, and paint all metal components of spillway gates, hoists, and associated equipment. Specific tasks include blasting and painting structures, performing minor structural girder modifications, installing or replacing rubber seals and cathodic protection anodes, and conducting weld repairs. Additionally, the contractor must remove and replace seal assemblies on the new set of stoplogs and perform light cleaning and maintenance overcoating on both new and old sets of stoplogs.
The response deadline for this solicitation is April 23, 2026. Electronic submission of all bid forms and bonds is required through the Procurement Integrated Enterprise Environment (PIEE). Metadata for this notice includes two PDF attachments: a pre-bid site visit sign-in sheet posted on March 31, 2026, and an initial project document posted on March 18, 2026. Jeffrey Donaldson serves as the point of contact for this requirement.