West Point Spillway Gate Painting
Contact and place of performance
Jeffrey Donaldson
31833
THIS IS A TOTAL SMALL BUSINESS SETASIDE. THIS PROJECT IS A STAND-ALONE ?C? TYPE, REQUEST FOR PROPOSAL (RFP), BEST VALUE SOURCE SELECTION SOLICITATION. Construction Order of Magnitude: Between $10,000,000 - $25,000,000 This project requires the Contractor to provide all labor, materials and equipment necessary to prep, prime and paint all metal components of the spillway gates, hoists and associated equipment. Paintin...
View moreThe Department of the Army, specifically the U.S. Army Corps of Engineers Mobile District, has issued solicitation W9127825RA078 for the repair or alteration of dams. This requirement is a total small business set-aside designated under the SBA (SBA) program, corresponding to NAICS code 237990 for Other Heavy and Civil Engineering Construction. The project is a stand-alone Request for Proposal (RFP) utilizing a best value source selection process. The estimated construction magnitude is valued between $10,000,000 and $25,000,000, and responses are due by April 23, 2026.
The scope of work requires the contractor to furnish all labor, materials, and equipment to prepare, prime, and paint metal components of spillway gates, hoists, and associated equipment. This includes blasting and painting structures, performing minor structural girder modifications, installing or replacing rubber seals and cathodic protection anodes, and conducting weld repairs. Additionally, the contractor must remove and replace seal assemblies on a new set of stoplogs before gate painting begins, followed by light cleaning and the application of a maintenance overcoat on both new and old sets of stoplogs.
Contract performance requires the use of a critical path method network analysis system. The solicitation includes bid options that may not be awarded. Jeffrey Donaldson serves as the point of contact for this requirement. Available documentation includes a pre-bid site visit sign-in sheet and an additional PDF attachment posted at the time of the initial notice. All proposal materials, including bid forms and bonds, must be submitted in electronic format.