Name | Type | Posted | Actions |
|---|---|---|---|
697DCK-26-R-00167-0004.pdf | Apr 23, 2026 | ||
Image 1.pdf | Apr 23, 2026 | ||
Questions and Answers 2 consolidated.docx | DOCX | Apr 23, 2026 | |
697DCK-26-R-00167-0003.pdf | Apr 10, 2026 | ||
697DCK-26-R-00167-0002.pdf | Apr 10, 2026 | ||
697DCK-26-R-00167-0001.pdf | Apr 10, 2026 | ||
J3 Drawings Amendment.pdf | Apr 7, 2026 | ||
DDC As Builts dated 7-14-2025.pdf | Apr 7, 2026 | ||
697DCK-26-R-00167-0001.pdf | Apr 7, 2026 | ||
J-6 Key Personnel Form.pdf | Apr 7, 2026 | ||
01 10 00 - SUMMARY REV 1.pdf | Apr 7, 2026 | ||
01 31 00 - PROJECT MANAGEMENT AND COORDINATION REV 1.pdf | Apr 7, 2026 | ||
23 09 23 - CONTROLS FOR HVAC REV 1.pdf | Apr 7, 2026 | ||
EWR-1507825 Ductless System Basis of Design_Product Selection.pdf | Apr 7, 2026 | ||
697DCK-26-R-00167.pdf | Apr 1, 2026 | ||
J-5 Past Performance Questionnaire.pdf | Mar 4, 2026 | ||
J-4 Wage Determination.pdf | Mar 4, 2026 | ||
J-3 Drawings.pdf | Mar 4, 2026 | ||
J-2 Specifications.pdf | Mar 4, 2026 | ||
J-1 Statement of Work.docx | DOCX | Mar 4, 2026 |
TSS Ductless System at EWR ATCT - Amendment 04
Contact and place of performance
Elisha Distler
NJ 07114
USA
Amendment 04 - Provide the final Q&A document and the corresponding Image 1. Establish the RFP due date of 04/30/26 at 5:00pm EST. Amendment 03 - Extend Q&A due date to 04/14/26 at 1800 CT Amendment 02 - Provide updated documents for Section J Amendment 01 - Provide site visit information Mechanical · Install (3) indoor wall-mounted units, along with all refrigerant and drain piping. &mi...
View more
Controls
· Integrate mini-split system into the existing FAA Schneider Electric EcoStruxure DDC system via BACnet
· Provide and install one IP-IO module at VAV-17 for coordinated backup cooling enable/disable
· Submit point list, graphics, and control narrative to COR for approval.
· Program unit set points, and update AHU-3 supply air setpoints
· Support commissioning of system to validate operation.
Structural & Interior
· Concrete core penetration for pipes and conduits
· Provide support framing for all units and steel plates as shown in drawing.
· Provide support for pipes and conduits.
· Work to include wall restoration and painting.
Site Visit - A site visit is scheduled for 03/17/26 at 3:00pm EST. If necessary, a secondary site visit will take place at 5:00pm EST. If interested in attending, notify the CO at [email protected] NLT 03/11/26 at 5:00pm CST. Please provide the names of all attendees and limit the total personnel to three individuals per firm.
The Federal Aviation Administration, through the 697DCK Regional Acquisitions Services office, is soliciting proposals for the installation of a TSS ductless system at the Newark Liberty International Airport (EWR) Air Traffic Control Tower (ATCT) in New Jersey. This project is classified under NAICS 238220 for Plumbing, Heating, and Air-Conditioning Contractors and PSC Z1BA for Maintenance of Air Traffic Control Towers. The solicitation is issued as a Small Business Administration (SBA) set-aside. Interested parties must submit their responses by April 30, 2026, at 5:00 PM EST.
The scope of work encompasses mechanical, electrical, structural, and control system requirements. Mechanical tasks include installing three indoor wall-mounted units, one six-ton heat pump anchored to an exterior concrete wall, and necessary refrigerant and drain piping. Electrical requirements involve installing a new dedicated 208V, 3-phase power circuit, a stainless steel disconnect, and various wall and roof penetrations that must maintain the existing roof warranty. Control system work requires integrating the mini-split system into the existing Schneider Electric EcoStruxure DDC system via BACnet and programming unit set points. Structural tasks include concrete core penetrations, providing support framing and steel plates, and conducting wall restoration and painting.
Elisha Distler serves as the primary point of contact for this solicitation, identified by number TSS_Ductless_System_at_EWR_ATCT. The procurement record includes 20 attachments, such as multiple amendment documents, a final consolidated questions and answers file, and relevant imagery. Site visits were scheduled for March 17, 2026, to allow potential bidders to inspect the installation location and coordinate necessary technical details. Progress on the solicitation has been documented through four amendments addressing site visit logistics, document updates, and extensions for the inquiry period.