Name | Type | Posted | Actions |
|---|---|---|---|
697DCK-26-R-00167-0004.pdf | Apr 23, 2026 | ||
Image 1.pdf | Apr 23, 2026 | ||
Questions and Answers 2 consolidated.docx | DOCX | Apr 23, 2026 | |
697DCK-26-R-00167-0003.pdf | Apr 10, 2026 | ||
697DCK-26-R-00167-0002.pdf | Apr 10, 2026 | ||
697DCK-26-R-00167-0001.pdf | Apr 10, 2026 | ||
J3 Drawings Amendment.pdf | Apr 7, 2026 | ||
DDC As Builts dated 7-14-2025.pdf | Apr 7, 2026 | ||
697DCK-26-R-00167-0001.pdf | Apr 7, 2026 | ||
J-6 Key Personnel Form.pdf | Apr 7, 2026 | ||
01 10 00 - SUMMARY REV 1.pdf | Apr 7, 2026 | ||
01 31 00 - PROJECT MANAGEMENT AND COORDINATION REV 1.pdf | Apr 7, 2026 | ||
23 09 23 - CONTROLS FOR HVAC REV 1.pdf | Apr 7, 2026 | ||
EWR-1507825 Ductless System Basis of Design_Product Selection.pdf | Apr 7, 2026 | ||
697DCK-26-R-00167.pdf | Apr 1, 2026 | ||
J-5 Past Performance Questionnaire.pdf | Mar 4, 2026 | ||
J-4 Wage Determination.pdf | Mar 4, 2026 | ||
J-3 Drawings.pdf | Mar 4, 2026 | ||
J-2 Specifications.pdf | Mar 4, 2026 | ||
J-1 Statement of Work.docx | DOCX | Mar 4, 2026 |
TSS Ductless System at EWR ATCT - Amendment 03
TSS Ductless System at EWR ATCT
Contact and place of performance
Elisha Distler
NJ 07114
USA
Amendment 04 - Provide the final Q&A document and the corresponding Image 1. Establish the RFP due date of 04/30/26 at 5:00pm EST. Amendment 03 - Extend Q&A due date to 04/14/26 at 1800 CT Amendment 02 - Provide updated documents for Section J Amendment 01 - Provide site visit information Mechanical · Install (3) indoor wall-mounted units, along with all refrigerant and drain piping. &mi...
View more
Controls
· Integrate mini-split system into the existing FAA Schneider Electric EcoStruxure DDC system via BACnet
· Provide and install one IP-IO module at VAV-17 for coordinated backup cooling enable/disable
· Submit point list, graphics, and control narrative to COR for approval.
· Program unit set points, and update AHU-3 supply air setpoints
· Support commissioning of system to validate operation.
Structural & Interior
· Concrete core penetration for pipes and conduits
· Provide support framing for all units and steel plates as shown in drawing.
· Provide support for pipes and conduits.
· Work to include wall restoration and painting.
Site Visit - A site visit is scheduled for 03/17/26 at 3:00pm EST. If necessary, a secondary site visit will take place at 5:00pm EST. If interested in attending, notify the CO at [email protected] NLT 03/11/26 at 5:00pm CST. Please provide the names of all attendees and limit the total personnel to three individuals per firm.
The Federal Aviation Administration is soliciting proposals for the installation of a ductless system at the Newark Liberty International Airport Air Traffic Control Tower in New Jersey under solicitation number TSS_Ductless_System_at_EWR_ATCT. This procurement is a designated SBA (SBA) set-aside classified under NAICS 238220 Plumbing, Heating, and Air-Conditioning Contractors and PSC Z1BA MAINTENANCE OF AIR TRAFFIC CONTROL TOWERS. Proposals are due by April 30, 2026, at 5:00 p.m. EST. The contracting office, 697DCK Regional Acquisitions Svcs, has provided 20 attachments for this solicitation, including consolidated questions and answers, technical images, and four amendments. Elisha Distler is the point of contact for this requirement.
The scope of work includes mechanical, electrical, and structural tasks necessary to install and integrate a new cooling system. Mechanical requirements involve installing three indoor wall-mounted units and a six-ton heat pump anchored to an exterior concrete wall, along with all refrigerant piping, drain lines, and wall waterproofing. Electrical tasks include the installation of a dedicated 208V three-phase power circuit and a NEMA 4X stainless steel disconnect. Contractors must perform roof deck penetrations and coordinate flashing with a Carlisle roof installer to maintain the existing warranty. Structural and interior work consists of concrete core penetrations, the installation of support framing and steel plates, and final wall restoration and painting.
Technical requirements also focus on controls and system commissioning. The mini-split system must be integrated into the existing FAA Schneider Electric EcoStruxure DDC system via BACnet. This involves providing an IP-IO module for coordinated backup cooling, programming unit set points, and updating supply air set points. The contractor is responsible for testing and charging the system to verify operation and supporting the full commissioning process to validate the installation.