Name | Type | Posted | Actions |
|---|---|---|---|
697DCK-26-R-00167-0004.pdf | Apr 23, 2026 | ||
Image 1.pdf | Apr 23, 2026 | ||
Questions and Answers 2 consolidated.docx | DOCX | Apr 23, 2026 | |
697DCK-26-R-00167-0003.pdf | Apr 10, 2026 | ||
697DCK-26-R-00167-0002.pdf | Apr 10, 2026 | ||
697DCK-26-R-00167-0001.pdf | Apr 10, 2026 | ||
J3 Drawings Amendment.pdf | Apr 7, 2026 | ||
DDC As Builts dated 7-14-2025.pdf | Apr 7, 2026 | ||
697DCK-26-R-00167-0001.pdf | Apr 7, 2026 | ||
J-6 Key Personnel Form.pdf | Apr 7, 2026 | ||
01 10 00 - SUMMARY REV 1.pdf | Apr 7, 2026 | ||
01 31 00 - PROJECT MANAGEMENT AND COORDINATION REV 1.pdf | Apr 7, 2026 | ||
23 09 23 - CONTROLS FOR HVAC REV 1.pdf | Apr 7, 2026 | ||
EWR-1507825 Ductless System Basis of Design_Product Selection.pdf | Apr 7, 2026 | ||
697DCK-26-R-00167.pdf | Apr 1, 2026 | ||
J-5 Past Performance Questionnaire.pdf | Mar 4, 2026 | ||
J-4 Wage Determination.pdf | Mar 4, 2026 | ||
J-3 Drawings.pdf | Mar 4, 2026 | ||
J-2 Specifications.pdf | Mar 4, 2026 | ||
J-1 Statement of Work.docx | DOCX | Mar 4, 2026 |
TSS Ductless System at EWR ATCT - Amendment 03
TSS Ductless System at EWR ATCT - Amendment 02
Contact and place of performance
Elisha Distler
NJ 07114
USA
Amendment 04 - Provide the final Q&A document and the corresponding Image 1. Establish the RFP due date of 04/30/26 at 5:00pm EST. Amendment 03 - Extend Q&A due date to 04/14/26 at 1800 CT Amendment 02 - Provide updated documents for Section J Amendment 01 - Provide site visit information Mechanical · Install (3) indoor wall-mounted units, along with all refrigerant and drain piping. &mi...
View more
Controls
· Integrate mini-split system into the existing FAA Schneider Electric EcoStruxure DDC system via BACnet
· Provide and install one IP-IO module at VAV-17 for coordinated backup cooling enable/disable
· Submit point list, graphics, and control narrative to COR for approval.
· Program unit set points, and update AHU-3 supply air setpoints
· Support commissioning of system to validate operation.
Structural & Interior
· Concrete core penetration for pipes and conduits
· Provide support framing for all units and steel plates as shown in drawing.
· Provide support for pipes and conduits.
· Work to include wall restoration and painting.
Site Visit - A site visit is scheduled for 03/17/26 at 3:00pm EST. If necessary, a secondary site visit will take place at 5:00pm EST. If interested in attending, notify the CO at [email protected] NLT 03/11/26 at 5:00pm CST. Please provide the names of all attendees and limit the total personnel to three individuals per firm.
The Federal Aviation Administration requires the installation of a ductless system at the Newark (EWR) Air Traffic Control Tower in New Jersey. The mechanical scope involves installing three indoor wall-mounted units and a six-ton heat pump anchored to an exterior concrete wall with a steel frame. Contractors must coordinate core penetrations, manage wall waterproofing, and provide insulated refrigerant and condensate piping above the ceiling before testing and charging the system. Electrical requirements include the installation of a dedicated 208V three-phase power circuit, a NEMA 4X stainless steel disconnect, and necessary conduit and wiring. All roof deck penetrations must be patched and flashed by a Carlisle Roof installer to maintain the existing warranty.
Control integration requires connecting the mini-split system to the existing Schneider Electric EcoStruxure DDC system via BACnet and installing an IP-IO module for coordinated backup cooling. Structural and interior tasks include providing support framing, steel plates, and pipe supports, as well as wall restoration and painting. This solicitation is identified as an SBA SBA set-aside under NAICS 238220 Plumbing, Heating, and Air-Conditioning Contractors and PSC Z1BA MAINTENANCE OF AIR TRAFFIC CONTROL TOWERS.
Proposals for solicitation TSS_Ductless_System_at_EWR_ATCT are due to the Regional Acquisitions Services office by April 30, 2026, at 5:00 PM EST. The agency has issued 20 attachments, including four amendments, consolidated questions and answers, and site imagery. Elisha Distler is the designated point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.