Name | Type | Posted | Actions |
|---|---|---|---|
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Feb 15, 2024 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Feb 15, 2024 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911S224B8300 | LINK | Feb 15, 2024 | |
https://dodprocurementtoolbox.com/ | LINK | Feb 15, 2024 |
Roofing Requirements Contract
Contact and place of performance
Samara Johnson
Not specified
ATTENTION BIDDERS: Amendment attachments are accessed by clicking "PIEE Solicitation Module Link for W911S224B8300" within the "Attachments/Links" section of the SAM.gov posting. That link will take you to the PIEE solicitation module. Click "Download All Attachments" button to download a compressed (zipped) folder; solicitation amendment and revised documents will be in a subfolder named 0001. The Contractor shall p...
View moreThe Department of the Army, MICC-FT DRUM, issued solicitation W911S224B8300 for a roofing requirements contract at Fort Drum. This procurement is designated as a HZC HUBZone set-aside under NAICS code 238160 Roofing Contractors and PSC Z2QA REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE). Interested parties must submit responses by the deadline of March 20, 2024, to the point of contact, Samara Johnson.
The selected contractor shall provide all supervision, plant, labor, equipment, materials, and appliances necessary to repair and replace existing roofs on various building structures. The scope of work requires that all completed facilities be watertight and impervious to weather and the elements. All operations must be performed by personnel skilled in the specific type of work involved, and the contractor is responsible for repairing or replacing any existing facilities damaged during performance at no cost to the government.
A preconstruction orientation will be held at Fort Drum prior to the start of work, unless waived by the government. The contractor must send a representative with the authority to make decisions and sign contractual documents to this meeting. Solicitation amendments and revised documents are managed through the PIEE solicitation module, as indicated in the notice published on February 15, 2024, and updated on March 13, 2024.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.