Name | Type | Posted | Actions |
|---|---|---|---|
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 7, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 7, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 7, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV25R0008 | LINK | Mar 7, 2025 |
WD Mayo Alignment Cell
Contact and place of performance
Tyler Hastings
Not specified
This is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14 which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS).
The Department of the Army, specifically the U.S. Army Corps of Engineers Tulsa District (W076 ENDIST TULSA), has issued solicitation W912BV25R0008 for the W.D. Mayo Alignment Cell project. This requirement is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14. The facility is a component of the McClellan-Kerr Arkansas River Navigation System (MKARNS).
The project is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Y1KB, Construction of Canals. This procurement is designated as a Small Business Administration (SBA) set-aside. Interested parties must submit their responses by the deadline of October 13, 2025.
Administrative oversight for this solicitation is managed by Tyler Hastings. The notice was originally published on March 7, 2025, and received its most recent update on October 7, 2025. As of the current update, there are zero attachments associated with this solicitation on the SAM.gov source page.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.