Name | Type | Posted | Actions |
|---|---|---|---|
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 7, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 7, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 7, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV25R0008 | LINK | Mar 7, 2025 |
WD Mayo Alignment Cell
WD Mayo Alignment Cell
Contact and place of performance
Tyler Hastings
Not specified
This is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14 which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS).
The Department of the Army, Corps of Engineers Tulsa District, has issued solicitation W912BV25R0008 for a Design-Build project at the W.D. Mayo Lock and Dam 14. This requirement involves the design and construction of a replacement guide wall extension cell as part of the McClellan-Kerr Arkansas River Navigation System (MKARNS). The project is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Y1KB, Construction of Canals.
This procurement is designated as an SBA Small Business Administration set-aside. Interested parties must submit their proposals by the response deadline of October 13, 2025. Tyler Hastings serves as the primary point of contact for this solicitation, which was originally published on March 7, 2025, and most recently updated on October 7, 2025. No attachments are currently associated with this notice on SAM.gov.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.