Name | Type | Posted | Actions |
|---|---|---|---|
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 7, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 7, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 7, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV25R0008 | LINK | Mar 7, 2025 |
WD Mayo Alignment Cell
Contact and place of performance
Tyler Hastings
Not specified
This is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14 which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS).
The Department of the Army, specifically the U.S. Army Corps of Engineers Tulsa District (W076 ENDIST TULSA), has issued solicitation W912BV25R0008 for the W.D. Mayo Alignment Cell project. This requirement is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14. The facility is a component of the McClellan-Kerr Arkansas River Navigation System (MKARNS).
The project is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Y1KB, Construction of Canals. This procurement is designated as a Small Business Administration (SBA) set-aside. Interested parties must submit their responses by the deadline of October 13, 2025.
The primary point of contact for this solicitation is Tyler Hastings. According to the notice metadata published on March 7, 2025, and last updated on October 7, 2025, there are currently no attachments associated with this entry on SAM.gov. All activities related to the design and construction of the guide wall extension cell will be performed under the oversight of the Tulsa District office.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.