Name | Type | Posted | Actions |
|---|---|---|---|
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 7, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 7, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 7, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV25R0008 | LINK | Mar 7, 2025 |
WD Mayo Alignment Cell
WD Mayo Alignment Cell
Contact and place of performance
Tyler Hastings
Not specified
This is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14 which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS).
The Department of the Army, Corps of Engineers Tulsa District, has issued solicitation W912BV25R0008 for the design and construction of a replacement guide wall extension cell. This project is located at the W.D. Mayo Lock and Dam 14, which serves as a component of the McClellan-Kerr Arkansas River Navigation System. As a design-build request for proposal, the scope entails both the engineering design and the physical construction of the alignment cell structure.
The acquisition is classified under NAICS 237990 for Other Heavy and Civil Engineering Construction and PSC Y1KB for Construction of Canals. This opportunity is designated as a Small Business Administration (SBA) set-aside. Interested parties must submit their responses by the deadline of October 13, 2025.
Tyler Hastings serves as the point of contact for this requirement. As of the latest update on October 7, 2025, the solicitation contains zero attachments. The project is managed by the W076 ENDIST Tulsa office to maintain navigation infrastructure within the regional river system.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.