Name | Type | Posted | Actions |
|---|---|---|---|
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 7, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 7, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 7, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV25R0008 | LINK | Mar 7, 2025 |
WD Mayo Alignment Cell
WD Mayo Alignment Cell
Contact and place of performance
Tyler Hastings
Not specified
This is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14 which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS).
The Department of the Army, Corps of Engineers Tulsa District, is issuing this Design-Build Request for Proposal (RFP) for the W.D. Mayo Alignment Cell project. The scope of work involves the design and construction of a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14. This facility is a critical component of the McClellan-Kerr Arkansas River Navigation System (MKARNS).
This solicitation is categorized under NAICS code 237990, Other Heavy and Civil Engineering Construction, and PSC Y1KB, Construction of Canals. The opportunity is designated as a total small business set-aside (SBA). Tyler Hastings serves as the primary point of contact for this requirement, identified under solicitation number W912BV25R0008.
The response deadline for this solicitation is October 13, 2025. This notice was originally published on March 7, 2025, and received its most recent update on October 7, 2025. There are currently no attachments associated with this notice on the source platform.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.