Name | Type | Posted | Actions |
|---|---|---|---|
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 7, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 7, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 7, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV25R0008 | LINK | Mar 7, 2025 |
WD Mayo Alignment Cell
Contact and place of performance
Tyler Hastings
Not specified
This is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14 which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS).
The Department of the Army, specifically the U.S. Army Corps of Engineers Tulsa District (W076 ENDIST TULSA), has issued solicitation W912BV25R0008 for a design-build project at the W.D. Mayo Lock and Dam 14. This facility is a component of the McClellan-Kerr Arkansas River Navigation System (MKARNS). The scope of work requires the design and construction of a replacement guide wall extension cell to support ongoing navigation operations.
The federal government has designated this procurement as an SBA (Small Business Administration) set-aside. The project is classified under NAICS 237990 for Other Heavy and Civil Engineering Construction and PSC Y1KB for Construction of Canals. Interested parties must submit their proposals by the response deadline of October 13, 2025. Tyler Hastings is the designated point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.